Course Summary
This unit of competency specifies the skills and knowledge required to erect and dismantle formwork for slabs on ground, rebates to slabs on ground, and steps to strip footings, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation.
The unit includes:
- establishing required levels on site and constructing formwork using boxing materials, including timber, metal, masonry, fibre cement sheeting or reconstituted timber products, and fixings to contain wet poured concrete until it is completely cured
- stripping the formwork and preparing and storing it for re-use.